Equity / Core+
The Core+ strategy
Contracted assets with a defined second phase
The most attractive operating assets in Vietnam come with an obvious next step: storage beside a solar farm, a second warehouse phase on leased land, a data hall with an anchor tenant. We look to buy the cash flow and underwrite the expansion.
The base asset has to carry its own debt service. The expansion, whether storage beside solar, a second warehouse phase or a new data hall, is underwritten separately, with its own permits, grid study and offtake.
At a glance
- Entry
- Majority or co-control stakes in operating platforms
- Revenue
- Contracted base plus expansion
- Counterparties
- Developers, industrial-park owners, utilities
- Hold
- Medium to long term
Where we build next
From the national programme to the assets we pursue
Each stage narrows the field: what the state has committed to, what fits this strategy, our screen, and where we are looking now.

01 · National mandate
10–16.3 GW
of storage required by 2030 under the revised PDP8, from 300 MW in the previous plan.
Source: Decision 768/QĐ-TTg via Vietnam Briefing02 · Built-in expansion
≥ 10%
of installed capacity in two-hour storage, now expected alongside many new utility-scale solar projects.
Source: Duane Morris03 · Our screen
Phase two
permitted or permittable within 24 months, with the base asset carrying debt service on its own.
04 · Where we look
Storage, logistics, data
BESS added to contracted solar, second-phase logistics on the Ring Road 3 corridor, and data halls with signed anchor capacity.
How we execute
From first contact to a held asset

- 01
Originate
Identify operating assets whose next phase is already in the land, grid or tenant file.
- 02
Diligence
Underwrite the base on contracted revenue alone; treat the expansion as upside with its own permits, grid study and offtake.
- 03
Structure
Stage capital so expansion funding is released against permit and offtake milestones.
- 04
Build
Manage the expansion through EPC contracts with fixed price and delay protection.
- 05
Own
Refinance once the expanded asset stabilises; recycle equity into the next phase.
Revenue certainty, not the currency, sets the cost of capital
Private investment in Vietnamese electricity fell 96 percent in 2023 after pricing rules changed. Our research on why contracted revenue, the base of every Core+ asset, matters more to investors than the dong.
Read moreIntelligence
What is being built now
Ho Chi Minh City and the south

Illustrative. Cat Lai port, Bem photography, CC BY 2.0 OperatingHo Chi Minh City, Dong Nai, Tay NinhSouthern industrial parks
92% ready-built factory occupancy
Q2 2026 occupancy: 76.3% for industrial land, 92.0% for ready-built factories, 91.7% for warehouses; demand shifting to Dong Nai and Tay Ninh.
Source: Cushman & Wakefield
Illustrative. BalticServers.com, CC BY-SA 3.0 Under constructionSaigon Hi-Tech Park and HanoiData centres
$2bn G42–FPT–VinaCapital campus
Capacity expected to grow to nearly 600 MW by 2030; power supply and land are the binding constraints.
Source: Viet Nam News
Illustrative. Cuong Tran, public domain Under constructionHo Chi Minh City, Dong Nai, Tay NinhRing Road 3
VND 75.4tn ($3.2bn)
76 km expressway ring; 29 km opened in December 2025, full opening targeted for 2026.
Source: VnEconomy
Vietnam

Illustrative. Vietbook, CC BY 3.0 Under constructionEVN network, led by HanoiGrid battery storage
305 MW in EVN’s first programme
First utility-scale pilot of 50 MW / 100 MWh in Hanoi; PDP8 targets 10,000–16,300 MW of storage by 2030.
Source: Vietstock
Bạc Liêu wind farm. Tycho, CC BY-SA 3.0 OperatingNationwideOperating renewables M&A
Decrees 57 and 58/2025
Buyers are concentrating on operating wind and solar, including projects whose legacy tariff issues are nearing resolution.
Source: VnEconomy
Status and figures as reported by each source, October 2026.
For investors, sponsors and developers
Allocation and Investment Requests
Investors can request an allocation to invest alongside us. If you are raising equity or debt for an infrastructure asset or platform in Vietnam or the region, tell us about it here; the answers help us see quickly whether it fits one of our strategies.
Every request is read by the team. You can also write to NDD@corvusindustries.com.
Related research
- Vietnam’s power investors fear contracts more than currenciesPrivate investment in Vietnamese electricity fell 96 percent in 2023 after pricing rules changed. Revenue certainty, not the dong, sets the cost of capital.
- Vietnam’s ports tripled their traffic. The roads behind them are only now catching upContainer traffic has tripled since 2013 and expressways have nearly tripled since 2020. The next phase needs about $115 billion in five years.